Project approval and legalization of dairies.
Development of industrial plants for registration (SIF, SIE, SIM), renovation, and expansion. We adapt operating factories to sanitary requirements for commercial expansion.
I want to do my project with ConsulakMain obstacles in structuring your dairy:
Complexity in Registration
The process of obtaining SIF, SIE, or SIM has strict technical requirements that frequently delay the start of operations.
Unregulated Factories
Industries operating without official registration face commercial barriers and the risk of fines by regulatory agencies.
Layout Limitations
The need to increase productive capacity clashes with inefficient layouts, hindering continuous renovations without halting the factory.
Rejection by Agencies
Projects designed by professionals without experience in the dairy sector suffer constant rejections, freezing investment.
Informality limits the growth of your industry.
The lack of proper registration restricts access to the retail market and creates severe tax and sanitary liabilities for active factories.
Risks of lack of registration
- Fines and interdictions by health and agriculture agencies.
- Direct risk of seizure and disposal of merchandise lots.
- Barriers to entry in large supermarket chains and biddings.
- Reduced profit margin due to limited sales channels.
Advantages of the inspection seal
- Legal security and compliance with current sanitary legislation.
- Clearance for national commercialization through SISBI equivalence.
- Credibility and immediate value addition to the brand.
- Access to specific credit lines for agribusiness and expansion.
Projects focused on productive efficiency and guaranteed approval.
Consulak's Architecture and Engineering team, under the technical responsibility of engineer Jessyca Canuto, is specialized exclusively in the dairy industry. We apply the knowledge of factory floor dynamics in every developed project.
- Technical Rigor: Structuring fully based on MAPA manuals and state legislation, aiming for approval without constructive rework.
- Adequacy Projects: Physical audit of the current plant and elaboration of a renovation project for legal compliance, prioritizing the lowest impact on civil works.
- Unidirectional Flow: Dimensioning of industrial layout aiming at the prevention of cross-contamination and the optimization of operational hygiene procedures.
Development and approval stages
Technical methodology applied to enable the implementation and issuance of your dairy's seal.
Feasibility Study
Topographical assessment, analysis of existing plant, and capacity dimensioning to direct the corresponding inspection service (SIF, SIE, or SIM).
Project Elaboration
Development of floor plans, equipment positioning, detailing of operational flows, sections, facades, and complementary projects.
Descriptive Memorial
Technical drafting of the Economic Sanitary Memorial of the Work, a document legally required to support the approval process.
Protocol and Processing
Documentary forwarding and active conduction of technical discussions with the regulatory agency until the official issuance of the project's approval opinion.
Frequently Asked Questions
Is it possible to regularize an operating factory without rebuilding the entire structure?
What is the technical difference between SIF, SIE, and SIM?
What is the average approval time for a dairy project?
Does the delivery scope include only architectural plans?
What our clients say
Industries that trusted Consulak to regularize, grow, and guarantee their approval.
“Extraordinary people. The visit served to align our goals and gain more knowledge. After yesterday, we renewed our energy — let's go for it!”
“We were very happy with the project approval — knowing everything went well! The shed is already built. It will be ready very soon, it will work out.”
Consulak was extremely important for the project approval — we couldn't have done it without you. Very attentive staff, Jessyca always available for all our questions. We are very grateful and without a doubt recommend and trust your work.
Guarantee the technical security of your industrial investment.
Talk to our experts. Request a technical quote and start the structuring or regularization process of your dairy.
I want to regularize my dairy with Consulak